Skip to content

Metallic & flake epoxy floors · Melbourne

Premium epoxy floors poured to a flawless finish.

Hand-poured metallic and hard-wearing flake epoxy floors for homes, garages and commercial spaces across Melbourne. Diamond-ground prep, the four-layer Hychem Onyx system, and a pattern no one else will ever have.

What kind of space?

or call 0400 000 000

We'll only use your details to prepare your quote. See our privacy policy.

  • Hychem Onyx approved applicator
  • Free quote, reply within 24 hours

The VVS difference

From screen to slab.

Pick a colour to see a digital preview of how your metallic floor could look.

  • Choose from the 42 Hychem Onyx metallic colours, alone or blended
  • Real samples on your slab before anything is poured
  • The pour decides the pattern, so no two floors match
Digital preview
Black Opal · Hychem Onyx metallicAn illustration only: real metallic pigment moves differently in every pour and in every light, so we bring real samples to your site.

The system

Four layers. One floor.

Every metallic floor is built with the Hychem Onyx Metallic Floor System: four layers from one manufacturer, each engineered to bond to the next. One build, one accountable result.

How we pour itHychem approved applicator
  1. Layer 04

    T2 Clear Sealer — Glass-like top coat

    A sol-gel clear coat that cures quartz-hard, deepening the metallic movement and resisting scratches, stains, chemicals and UV. Gloss, satin or matte.

  2. Layer 03

    Onyx Design Coat — Metallic pour

    Self-levelling metallic resin, worked by hand while wet. The pigments swirl, pool and shimmer into a one-of-a-kind figure as it flows out mirror-flat.

  3. Layer 02

    SupaFloor Base — Coloured epoxy body

    A 100% solids, solvent-free epoxy in your chosen base colour. Rated at 75 MPa compressive strength, it is the tough, stable platform the design sits on.

  4. Layer 01

    Polyprime SB — Primer & bond coat

    Penetrates the ground concrete and grips it, creating the bond for everything above and stopping pinholes and outgassing from spoiling the finish.

  5. Prepared concrete, diamond-ground to CSP 2
Build thickness
1.0–1.5 mm
Compressive strength
≥ 75 MPa
Hardness
Shore D 78–80
Light foot traffic
After 24 hours
Full cure
7 days
Finish
Gloss, satin or matte

Typical cured values for the full system, from the Hychem system data sheet.

How it works

Four steps to a flawless floor.

No pressure and no surprises. You'll know the price, the plan and the finish before we start.

  1. Step 01

    Tell us about the space

    Send a few photos, the rough size and how you use the space. Use the form or just give us a call.

  2. Step 02

    We inspect the slab and quote

    We visit, check the concrete and test for moisture, then give you a free, fixed quote in writing.

  3. Step 03

    Choose your finish

    We bring real samples so you can see colours and textures in your own light before you decide.

  4. Step 04

    We prep, pour and seal

    Diamond grinding and repairs, then your chosen coating system, locked in with a clear protective top coat.

Why VVS

Named for a diamond. Held to one.

VVS / very, very slightly included /
The clarity grade for diamonds whose flaws are so small they are hard to find even under magnification. It is the standard we hold every floor to.
  1. Clarity

    Honest, written quotes.

    A free, fixed quote in writing before any work starts: what we will do, what system we recommend and why. No vague estimates, no surprises at the end.

  2. Preparation

    The work you never see.

    Diamond grinding, crack repair and moisture testing decide how long a floor lasts. It is most of the job, it happens before a drop of resin is poured, and we never rush it.

  3. Finish

    Flawless, under any light.

    A clear, durable top coat with no dust, runs or haze. Imperfections so slight you would have to go looking for them: that is the standard we work to.

FAQ

Questions, answered.

Can't see yours? Ask us directly. We reply to quote requests within 24 hours.

How much does a metallic epoxy floor cost?

It depends on the size, the condition of your slab and the finish you choose. Every metallic floor is hand-poured, so we price each one on site. Send us a photo and rough size and we will give you a free, fixed written quote.

Can you pour over my existing concrete?

Usually, yes. We diamond-grind the slab, repair cracks and test for moisture before anything goes down. Old sealers, paint or tile adhesive are removed first so the new floor bonds properly, and a moisture barrier is added if readings are high.

Will my floor look exactly like the samples?

No two metallic pours are alike. You choose the colours and the style of movement, and the pigments settle into a pattern that is unique to your floor. Samples show the character, not an exact copy.

How long will my space be out of use?

Most floors take 3 to 5 days to install across the four layers. You can walk on it after about 24 hours and the system is fully cured after about 7 days.

Does it fade or yellow in the sun?

All metallic epoxies are sensitive to UV. The clear top coat is UV-stable, but in long, direct sunlight the design layer can warm slightly in tone over time. Indoors it is rarely noticeable. If your floor gets strong sun, we will talk it through before you commit.

Do you work in my area?

We pour metallic and flake epoxy floors across Melbourne, and we take on metallic epoxy projects in New Zealand. Flake epoxy is offered in Melbourne only. Tell us where the floor is and we will confirm.